• Question 1

    by

    New work on current buildings include:  Reconfiguration of the main entry and lobby to create a secure entryway at Smithville Primary Elementary School (SPES); new canopy for exterior of front entry at SPES; new state of the art health room at SPES; cafeteria addition at Smithville High School (SHS); and eight (8) additional classrooms at Smithville SHS.

    Renovation and building upgrades include: HVAC upgrades at SPES; classroom remodel including new casework and paint at SPES; flooring improvements at SPES; acoustic improvements to cafeteria at SPES; bus and parking lot renovation including a new access lane and more parking spaces at SPES; roofing improvements at SPES and SHS; classroom and science lab renovations at SHS; updates to counselor offices and conference room at SHS; asphalt improvements at SHS; band room renovation work to include removing a wall and casework between classrooms and installing an operable partition at Smithville Middle School (SMS); remodel of existing classroom space for SILC program (alternative high school); remodel existing classroom to create maker spaces at Smithville Upper Elementary School (SUES); acoustic improvements to cafeteria at SUES.

     

    Question 1 Smithville Bond 2016 Boards.pdf 1.99 MB (Last Modified on September 16, 2016)
    Comments (-1)
  • Question 2

    by

    An additional elementary school that will serve students grade Pre-K – 6.

    Question 2 Smithville Bond 2016 Boards.pdf 2.02 MB (Last Modified on September 16, 2016)
    Comments (-1)
  • Summary of Work

    by
    Smithville 2016.pdf 2.48 MB (Last Modified on September 20, 2016)
    Comments (-1)
CLOSE